ASTM C31: making and curing concrete cylinders in the field

By Last reviewed:

Key takeaways

  • Initial curing lasts up to 48 hours at 60–80 °F, or 68–78 °F when f'c is 6,000 psi or more.
  • Record maximum and minimum curing temperatures; without them the range cannot be shown.
  • Mold cylinders where they will cure, and label each one back to the sample and truck ticket.
  • Keep standard-cured and field-cured cylinders in separate sets.

Try it: aci 318 acceptance calculator

The same calculator as the free tool. Runs in your browser; nothing is saved.

Open the full aci 318 acceptance calculator page

Most disputes about low concrete strength end up back at the cylinders, and most cylinder problems start in the first two days of their life. ASTM C31 covers how field technicians make, store and transport test specimens so that the break in the lab reflects the concrete, not the handling. For a small lab, the field crew is often the same two or three people every day, which makes good habits easy to build and bad ones easy to spread. This guide covers what matters on site, what to write down, and why a lapse on day one can decide whether a project passes acceptance weeks later.

What is ASTM C31 for?

Cylinders made under C31 are the specimens that feed C39 breaks and, through them, the project acceptance check. Standard-cured cylinders are meant to show the potential strength of the concrete as delivered. Field-cured cylinders, when a project calls for them, are meant to show how concrete in the structure is doing under site conditions. The two serve different purposes, so do not mix them in one set and label them clearly.

The practice exists because a cylinder is easy to damage invisibly. Jarring, freezing, drying out or overheating in the first hours can cost strength that no lab procedure can recover.

Cylinder life from sample to breakFive stages: sample, mold, initial curing, transport, standard curing and break.01SampleASTM C17202MoldLevel, on site03Initial cureUp to 48 h, 60–80 °F04TransportProtected05Cure and breakASTM C39
A cylinder's first days: sample, mold, initial curing inside the temperature range for up to 48 hours, then transport and standard curing until the break.

What equipment do you need to make concrete cylinders?

Single-use or reusable molds of the right size (4 × 8 in and 6 × 12 in are the common sizes), a tamping rod or vibrator suited to the mold and the slump, a mallet, a strike-off tool, a small scoop, and a sample taken under ASTM C172. For initial curing you need a place that holds the cylinders level, protected and inside the required temperature range, plus a maximum-minimum thermometer so you can prove it.

Write the mold size on the field sheet. The acceptance rules count cylinders differently for 4 × 8 and 6 × 12 sets.

How do you make concrete test cylinders in the field?

Obtain a composite sample from the truck as C172 describes, and start molding promptly. Place the molds on a level, rigid surface close to where they will spend their first night, so you are not carrying freshly molded cylinders across a site. Fill each mold in the number of layers the standard sets for your mold size and consolidation method, consolidate each layer, tap the sides to close voids, strike off the top and cover the molds to stop evaporation.

Mark each cylinder with an identifier that ties it to the sample, the truck ticket and the placement. Record the time of molding and the maximum-minimum temperatures during initial curing. Then leave them alone until it is time to move them to the lab.

What temperature should cylinders be kept at during initial curing?

During initial curing, for up to 48 hours, cylinders are kept at 60 to 80 °F. When the specified strength is 6,000 psi or more, the range tightens to 68 to 78 °F. These are sensible default warning ranges for a lab's records, and they should be editable per project because some specifications add their own requirements.

The maximum-minimum thermometer reading is the evidence. Write down both values when the cylinders are picked up. A record that says only "cured on site" cannot show that the range was met, and a reviewer who sees a low break with no curing record has nothing to rule out.

How do handling errors affect strength results?

A set that sat in a hot truck bed or froze overnight does not fail with a warning label. It just breaks low. On its own, one low test may still be above the single-test limit, yet it drags down the running average of three, and that can be the difference between acceptance and an investigation with cores. The worked example below shows how a single soft test sits inside an otherwise healthy series.

Because the strength math cannot tell a curing problem from a concrete problem, the field record has to. Curing temperatures, transport notes and the fracture type from the break are what let a reviewer separate the two.

What formulas are used?

  1. 01Initial curing: up to 48 hours at 60–80 °F; 68–78 °F when f'c ≥ 6,000 psi
  2. 02Strength test = average of ≥ 2 cylinders (6 × 12) or ≥ 3 cylinders (4 × 8) at the same age
  3. 03Running average of 3 consecutive tests ≥ f'c
  4. 04Single test ≥ f'c − 500 psi (f'c ≤ 5,000) or ≥ 0.90 × f'c (f'c > 5,000)

What does a worked example look like?

Inputs

Series 1: f'c 4,000 psi, 6 × 12 cylinders at 28 days. Test 1: 4,100 and 4,150 psi. Test 2: 3,600 and 3,700 psi (a set with a gap in its curing record). Test 3: 4,250 and 4,300 psi. Series 2: f'c 6,000 psi, one test of 5,300 and 5,400 psi.

Result

Series 1: test averages 4,125, 3,650, 4,275 psi; running average 4,017 psi (pass); single-test limit 3,500 psi (pass). The weak test still passes, but it leaves very little margin in the running average. Series 2: test average 5,350 psi against a limit of 5,400 psi, so the single-test check is a fail; the running average is pending until three tests exist.

Calculated by the same tested functions as the ProofGrit free calculators.

How do you tell a curing problem from a concrete problem?

Start with the record, not the number. If the maximum-minimum readings fall inside the required range, the cylinders were picked up on time and the fracture types look normal, a low result points more toward the concrete. If the record shows a temperature outside the range, a late pickup or rough transport, the result may describe the handling instead.

Compare companion cylinders too. Cylinders from one sample that break far apart often share a handling story. A whole set that breaks low together, with a clean curing record, is a stronger signal about the concrete itself and is the case where an engineer may ask for further investigation.

What are the most common C31 mistakes?

Molding on the tailgate and then carrying the cylinders. Mold where they will cure.

No thermometer in the curing box, or a thermometer nobody reads. If the range is not recorded, it was not met as far as the record is concerned.

Moving cylinders too early, or bouncing them unprotected across a site in the back of a pickup.

Labels that only make sense to the person who wrote them. Tie every cylinder to the sample and ticket.

Mixing field-cured and standard-cured cylinders in one acceptance set.

Which standards relate to ASTM C31?

ASTM C172 covers sampling the concrete before molding. ASTM C39 covers breaking the cylinders. ACI 318 contains the acceptance criteria applied to the strength tests. The standards index lists every standard explained on this site.

See the standards index for every standard covered on this site.

Standard-cured versus field-cured cylinders
ItemStandard-curedField-cured
PurposePotential strength of the concrete as deliveredHow concrete in the structure is doing on site
Used for acceptanceYes, under the project acceptance rulesOnly where the specification calls for it
Curing after the first daysControlled lab curingAlongside the structure, as the standard describes
Mix in one set?NoNo

Frequently asked questions

Why does the curing range change at 6,000 psi?

Higher-strength mixes are more sensitive to early temperature, so the initial curing range is narrower when the specified strength is 6,000 psi or more.

How long can cylinders stay in initial curing?

Up to 48 hours, then they go to final curing as the standard describes. Record when they were moved.

Do 4 × 8 cylinders need more specimens per test?

Yes. A strength test is the average of at least three 4 × 8 cylinders, or at least two 6 × 12 cylinders, tested at the same age.

Can a low cylinder be thrown out?

Not just because it is low. Follow the standard and the project specification for when a specimen can be set aside, and record the reason.

Who should record the curing temperatures?

Whoever picks the cylinders up from the site, at the time of pickup. Both the maximum and minimum readings belong on the record.

How ProofGrit helps

The free ACI 318 acceptance calculator on the ProofGrit site shows how each strength test feeds the running average and the single-test limit, which makes the cost of a mishandled set easy to explain to a field crew. The concrete compressive strength calculator handles the breaks themselves. Both run in the browser and do not store data.

This guide is a plain-English summary. Always follow the current standard and your project specifications.